DRYING

A 2.5 MW biomass unit can supply heat up to 700 m3 of drying capacity.

Traditional drying chambers of great capacity ensure us the drying of sawing but also the treatment at high temperature according to the international phytosanitary standards (ISPM 15). A vacuum drying tunnel ensures the drying of large sections beams in a very short time.

CIMG4342
CIMG2869